General requirements must be a professional and safety of this type of work, technical training, examination qualified to obtain an operating certificate only after the certificates. 2 familiar with the process of this job, learn containing debris amount of coal. Three familiar separator structure, performance and works, familiar with its operation and safety requirements, and eliminate common problems. 4 strictly enforce the "Coal Preparation Plant safety procedures, technical operation of personal responsibility, shift system and other relevant regulations. 5 posts required to wear protective clothing. Second, the safety requirements the 6 dump belt separator running do not stay in front of the unloading iron position, and any part of the body into the unloading iron chute below is strictly prohibited. 7 belt conveyor and magnetic separator run and work status, non-iron removal operation. Eight non-standing separator is below the clean-up of iron and other debris. Third, work preparation before 9 "Coal Preparation Plant General requirements of mechanical and electrical equipment inspection checks before driving the Separators various parts of the situation, identify problems and timely report processing. 10 carefully check the security device is safe and reliable, in addition to the iron chute whether the lay a trap, identify problems in time. The normal operation of the provisions of section 11 of separator must wait until the car before the start of the main belt, parking, must be the main belt material pull empty parking before parking. 12 sucked out of the Iron timely recovery of clean-up, found detonators must be turned over to the shop floor, non-possession of. 13 Separators runtime is prohibited under the separator and iron around the discharge port to move around, stay or clean-up iron to prevent iron wounding. 14 process should always check plant operations, must be shut down immediately when the belt run, open connection clamp body swing anomalies, and report on the plant dispatch room. 15 repair or processing separator failure, must be cut off. V. operations after working 16-place car, after receiving the stop signal, and allow the device no material before press the stop button to stop. 17 set of control car parking, centralized control by the scheduler. 18 shift before the sanitation of the work area should be clean, wide range of items neatly stacked. 19 should be at the scene shift, explained in detail the operation of the Qing bumban separator position to take over personnel, failures and problems of, fill out the required the good bumban running log, completion of their shift change procedures, the can handover.
Copyright:Linqu Huazhong Jixieshebei Co.,Ltd. Add:Weifang, Shandong Linqu Economic Development Zone Technical support:Seahigh Network
phone:13455690699 tel:086-0536-3450699 fax:086-0536-3472569 E-mail:sdjx1314@163.com