1, a long time after the operation on a roll crusher, roll surface wear, cause product particle size too small, then pay attention to adjust to the port of discharge or maintenance equipment. Strengthen the checks roll crusher parts, refueling time, lubricating parts of the crusher and keep equipment well lubricated. Viscous material easy to plug the broken space, in dealing with clogged fault should stop treatment, are not allowed to to poke mine in operation. 4, pay attention to the large pieces of ore, when the roll crusher processing materials containing large pieces more easily squeezed out from the crushing space, to prevent injury or damage to equipment. 5, to strengthen than to mine iron work. Non-broken (brazing first class objects) fall into the crusher, resulting in parking accident between rolls damage. So the device should be installed in addition to iron Crusher ago.
Copyright:Linqu Huazhong Jixieshebei Co.,Ltd. Add:Weifang, Shandong Linqu Economic Development Zone Technical support:Seahigh Network
phone:13455690699 tel:086-0536-3450699 fax:086-0536-3472569 E-mail:sdjx1314@163.com